Remodels, tear-outs & builds
Building material is heavy. Here's what each dumpster takes, how weight is billed, and where concrete and soil go instead.

On a job site the question is rarely whether the debris fits — it's what it weighs. Drywall, lumber and cabinets are one kind of load; concrete, soil and brick are another, and they are priced and handled differently. This page sorts out which material goes in which container.
Construction Debris is booked in the 20-yard (2 tons included) or the 30-yard (3 tons included), both with a 7-day rental. Heavy materials go in a 10-yard with no weight limit.
$649 $699
16′×8′×4′ · 7-day rental · 2 tons included
Single-room remodels, a bathroom or kitchen tear-out, small framing jobs.
$749 $799
16′×8′×6′ · 7-day rental · 3 tons included
Multi-room renovations and larger builds with bulky material.
The 20-yard includes 2 tons and the 30-yard 3. Weight is measured at the disposal facility and billed from the certified scale ticket: anything over the allowance is $179 per ton, prorated, so half a ton over costs half that rate.
Dense material is what pushes a load over. Tile set in mortar, plaster, wet drywall, and any concrete or dirt that rides along with the debris add weight much faster than they add volume. Light, bulky material such as framing lumber and cabinets does the opposite.
When a demolition produces a lot of masonry, a separate 10-yard costs less than the overage: clean concrete is $599 for 3 days with no weight limit.
The clean rates — $599 for clean concrete and $599 for clean soil — need a load that is 100% that material: no rebar, trash, wood or other debris mixed in, and concrete broken into small pieces.
Soil and concrete together are the mixed rate, $899. Bricks are $1,100 and clean asphalt $899. The 10-yard measures 12′×8′×2.5′; keep the load below the top edge.
Demolition is where the heavy material comes out. If the job starts by breaking up a slab, a patio or a masonry wall, order the 10-yard heavy-materials dumpster for that phase and keep the masonry out of the debris box entirely.
Tear-out and rebuild produce the lighter, bulkier material: drywall, framing, cabinets, flooring, trim and packaging. That is what the 20- and 30-yard construction debris containers are for, and where volume matters more than weight.
Keep prohibited material off the site's dumpster from day one: paint, solvents, fuel, batteries, asbestos and other hazardous material can't be hauled at any price, and if they are found in a load they are left behind.
The 20- and 30-yard include 7 days. You can add days at $49 each, up to 14 extra, by calling before the pickup date.
If the container fills up before the job is done, book a swap online: we take the full dumpster and leave an empty one at the same address. A swap is priced like a new rental and the rental days start over on the swap day.
Contractors who rent regularly can see our contractor page for how we work with repeat customers.
A few broken pieces, yes, but they count against the 2- or 3-ton allowance. A slab, footing or patio belongs in a 10-yard: $599 for clean concrete with no weight limit.
Then it isn't clean concrete. The clean rate needs a 100% pure load in small pieces; a load of soil and concrete together is the mixed rate, $899. Call (510) 650-2083 before booking if you're not sure which applies.
At the disposal facility. The certified scale ticket sets the weight, and anything over the included tons is $179 per ton, prorated.
Yes. Roofing has its own option at the same prices; choose it for a tear-off so the load is booked correctly. A 20-yard takes a roof of up to about 30 squares.
Yes. A swap replaces the full container with an empty one, costs the same as a new rental, and restarts the rental days on the swap day. Book it online with the same address and contact details.
Yes, for a flat fee per load listed in our Terms. Tell us when you book.
Book a construction debris dumpster online, or call (510) 650-2083 to match each material to the right container.